The establishment of trucks parking Terminals- East Port Said Port

Owner
Port Said Port Authority Main Contractor
El Dawlia Co.
Consultant
Maritime Research & consultant Center (MRCC)
Duration
Oct. 2012 to Jan. 2014
Total Value
 70,000,000 L.E.

Scope of Work

The 1st stage of the truck parking terminal is located on area 170,000 m2 the work include the following:
- Excavation works with dewatering for about 1,100,000m3
- Backfilling works using imported materials for about 200,000 m3
- Park Terminal concrete blocks and asphalt works for about 120,000m2
- Construction of administration buildings , police and fire fighting building ,Entrance gates buildings , land scape works and steel car shades
- Infrastructure works for the electric and mechanic utilities