Port Said East Container Terminal project phase 2

Owner
Suez Canal East Container Terminal (SCCT) Engineer
Royal Haskoning and Pacer.  
Main Contractor
Petrojet Co.
Period
Jan. 2010 to Sep. 2012
Total Value
 180.00 million L.E.

Scope of Work
  1. Excavation, dewatering and disposal the excavated material to the dumping area of total quantity = 4.00 million m3.
  2. Soil replacement using imported sand of total quantity = 2.20 million m3.
  3.  Soil replacement using suitable excavated material stocked at site of total quantity  = 500,000 m3
  4. Sub base layer of total quantity = 200,000 m3.
  5. Sand Cement layer of 44 cm = 450,000 m3.
  6. Concrete Paving Blocks (Interlock) Mechanical/manual laying = 560,000 m3